Five聽diverse聽projects under construction by 黑料不打烊 rank among the Largest Construction Projects in the East Bay, according to the SF Business Times, East Bay Book of Lists 2012.聽 Ranked by cost of construction, the list notes the following聽黑料不打烊 projects:
20th:聽EBMUD’s Chevron RARE Waste Water Treatment Plant, a $32 M high purity water plant24th: Alta Bates/Summit Parking Structure, a $26 M, 7-level, 1,079 stall parking structure addition in Oakland, CA.25th: Lawrence Berkeley National Lab User Support Building, a $25 M 30,000 sf steel frame project.
In addition,聽the Largest Construction Projects in Oakland List includes three 黑料不打烊 projects:
7th: Alta Bates/Summit Parking Structure (see description above).8th: Kaiser Oakland Parking Structure, a $25 M, 10 story, 431,988 sf structure with 1,211 stalls.10th: EBMUD Power Generation Station, a $20 M four-mile wide, biogas-fueled solar turbine cogen facility.